Sierra Vista Community Theatre Wiki

Entertain, Educate, Empower and Inspire

User Tools

Site Tools


positions:director

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
positions:director [04/01/2026 07:54 PM (2 months ago)] – [Job Description] Chris Daleypositions:director [04/02/2026 10:44 AM (2 months ago)] (current) – [Group Chats] added who's on the Production chat Chris Daley
Line 33: Line 33:
 ==== Calendar ==== ==== Calendar ====
  
-Before rehearsals begin, you should have a full schedule from the 1st rehearsal to the last on exactly how you are to use your time. Time is the most precious commodity we have in the theatre, so it is paramount that you use that time wisely. +Before rehearsals begin, you should have a full schedule from the 1st rehearsal to the last on exactly how you are to use your time. Time is the most precious commodity we have in the theatre, so it is paramount that you use that time wisely. **It is imperative that your calendar is up to date.**
- +
-**It is imperative that your calendar is up to date.**+
  
 Every production will have an IT Manager assigned from the Communications Department, who will help you create, update and maintain your calendar as needed. You and your PSM should have access to make changes and updates to your calendar. Everyone involved in the Production should be able to view it. If you have any problems, talk to your IT Manager. Every production will have an IT Manager assigned from the Communications Department, who will help you create, update and maintain your calendar as needed. You and your PSM should have access to make changes and updates to your calendar. Everyone involved in the Production should be able to view it. If you have any problems, talk to your IT Manager.
 +
  
 ==== Group Chats ==== ==== Group Chats ====
Line 43: Line 42:
 Your IT Manager will also help you set up Google Group chats for your production. Examples include: Your IT Manager will also help you set up Google Group chats for your production. Examples include:
  
-  * //**Production// Cast & Crew** - includes everyone in the production. Group announcements, birthday wishes, etc. go here. +  * **production Cast & Crew **- includes everyone in the production. Group announcements, birthday wishes, etc. go here. 
-  * //**Production// Production** - design team membersetc. Reserved for serious conversations about the production. +  * **production Production **- includes the DirectorPSM, all designers, the Producer, and the SVCT Technical Director. Reserved for serious conversations about the production. 
-  * //**Production// Build Team** - used by the build team to coordinate schedules, etc. +  * **production Build Team **- used by the build team to coordinate schedules, etc. 
-  * //**Production// Costume Team** - used by the costume team to coordinate schedules, etc. +  * **production Costume Team **- used by the costume team to coordinate schedules, etc 
-  * //**Production// Paint Team** - ... you get the idea+  * **production Paint Team **- ... you get the idea 
  
 ==== Design Meetings ==== ==== Design Meetings ====
Line 59: Line 59:
 ===== Production / Rehearsal ===== ===== Production / Rehearsal =====
  
-Once you have cast your show, you will begin having rehearsals. These rehearsals should be well planned and structured. +Once you have cast your show, you will begin having rehearsals. These rehearsals should be well planned and structured.  By this time, the other design aspects should be in the building phase, particularly costumes, sets and props. More design meetings need to happen to check on progress. You should have eyes on each element as it is created, and you should have already set deadlines for when these are to be completed.  During this time there will also be media day, tech week and dress week.
- +
-By this time, the other design aspects should be in the building phase, particularly costumes, sets and props. More design meetings need to happen to check on progress. You should have eyes on each element as it is created, and you should have already set deadlines for when these are to be completed. +
- +
-During this time there will also be media day, tech week and dress week.+
  
 FIXME START HERE FIXME START HERE
  
  
positions/director.1775098453.txt.gz · Last modified: by Chris Daley

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki

You are here: Welcome » Positions » Director

Trace:

Except where otherwise noted, copyright © 2025 - 2026 Sierra Vista Community Theatre.