| ====== Design Meetings ====== | ====== Design Meetings ====== | ||
| - | Design meetings are when you meet with your design team to discuss the direction, look, sound, and feel of the production. It is also a time to ensure proper communication is happening between the design team (designers) and the production team (director | + | Design meetings are when the Director and PSM meets with their design team to discuss the direction, look, sound, and feel of the production. It is also a time to ensure proper communication is happening between the design team (designers) and the production team (Director |
| The Director will call Design Meetings. The PSM will act as the scribe for these meetings, keeping notes and deadlines for the use of the Director as needed. | The Director will call Design Meetings. The PSM will act as the scribe for these meetings, keeping notes and deadlines for the use of the Director as needed. | ||
| Line 81: | Line 81: | ||
| ==== Design Meeting 1 ==== | ==== Design Meeting 1 ==== | ||
| - | The first meeting is where you meet with your designers for the first time. | + | The first meeting is where Director and PSM meets with their designers for the first time. |
| ==== Design Meeting 2 ==== | ==== Design Meeting 2 ==== | ||
| - | The second meeting is when your designers will bring you their preliminary designs. | + | The second meeting is when the designers will bring their preliminary designs. |
| ==== Design Meeting 3 ==== | ==== Design Meeting 3 ==== | ||
| - | This should be a final approval of each design from your designers. Once you approve your designs, the designers should begin working with the builders/ | + | This should be a final approval of each design from the designers. Once the Director approves their designs, the designers should begin working with the builders/ |
| ==== Design Meeting 4 ==== | ==== Design Meeting 4 ==== | ||
| - | The fourth meeting will be to shore up any loose ends or missing items. | + | The fourth meeting will be to shore up any loose ends or missing items. |