Sierra Vista Community Theatre Wiki

Entertain, Educate, Empower and Inspire

User Tools

Site Tools


activities:main_stage:design_meetings

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
activities:main_stage:design_meetings [04/01/2026 06:22 PM (5 hours ago)] – fix capitalization & minor issues Chris Daleyactivities:main_stage:design_meetings [04/01/2026 06:32 PM (4 hours ago)] (current) – [Design Meeting 3] Chris Daley
Line 89: Line 89:
 ==== Design Meeting 3 ==== ==== Design Meeting 3 ====
  
-This should be a final approval of each design from the designers. Once the Director approves their designs, the designers should begin working with the builders/fabricators. Ideally, this meeting should happen around the same time as Auditions and Onboarding. FIXME //timing correct?//+This should be a final approval of each design from the designers. Once the Director approves their designs, the designers should begin working with the builders/fabricators. Ideally, this meeting should happen shortly after Onboarding. FIXME //timing correct?// 
  
 ==== Design Meeting 4 ==== ==== Design Meeting 4 ====
activities/main_stage/design_meetings.1775092967.txt.gz · Last modified: by Chris Daley