Sierra Vista Community Theatre Wiki

Entertain, Educate, Empower and Inspire

User Tools

Site Tools


activities:main_stage:load_in

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

activities:main_stage:load_in [04/02/2026 03:09 PM (24 hours ago)] – created Chris Daleyactivities:main_stage:load_in [04/02/2026 07:30 PM (20 hours ago)] (current) Chris Daley
Line 1: Line 1:
 ====== Load In ====== ====== Load In ======
  
-The Load In is when the set and other aspects are constructed on the stage for the production. It is expected that the set build will be mostly complete with the exception of any elements that must be built in place and some painting. This is why the stage design needs to be completed and signed off shortly after Onboarding.+The Load In is when the set and other items for the production are moved onto or constructed on the stage.
  
-The set will be loaded once the preceding show has been struck from the stage.  This will be overseen by the Master Builder, with assistance from Set Designer, Director, and the SVCT Master Carpenter, as needed.+It is expected that the set build will be mostly complete before Load In, with the exception of any elements that must be built in place and some painting. This is why the stage design needs to be completed and signed off shortly after Onboarding.
  
-Before Load In, the Master Builder and PSM will meet with the previous production's Master Builder and PSM to see what elements of the previous set can be reused and to work out the schedule for Load Out and Load In. The Master Builder will also a load in plan with a crew and assignments ready to go.+Load In will commence after the preceding show has been struck from the stage (Load Out).  Load In will be overseen by the Master Builderwith assistance from the Set Designer, Director, PSM and/or the SVCT Master Carpenter, as needed.
  
-The PSM’s job for Load In is to ensure that everyone is communicating, and that the Master Builder is ready to go and has a completed plan and adequate help.+Before Load In, the Master Builder and PSM will meet with the previous production's Master Builder to see what elements of the previous set can be reused and to work out the schedule for Load Out and Load In. The Master Builder will also create a load in plan with a crew and assignments ready to go. 
 + 
 +The PSM’s job for Load In is to ensure that everyone is communicating, and that the Master Builder is ready to gohas a completed planand adequate help.
  
  
activities/main_stage/load_in.txt · Last modified: by Chris Daley